YEAR

2010

LOCATION

Space Coast, FL

ABOUT

JP Donovan Construction provided Design/Build services for a 6,800 square foot SCIF and non-SCIF office facility. SCIF area includes two separate office bullpens with a common stand alone conference room. Each of these rooms has access control and sound attenuation construction. Non-SCIF floor space includes a lobby, administration offices, conference room, restrooms and two break rooms.

Project Highlights:

  • UL 2050 Certified SCIF Facility
  • Administration offices
  • Break and Conference rooms
  • Seismic Design Zone 4
  • Steel Frame construction
  • Telecommunication Systems
  • Intrusion Detection
  • Access Control
  • Asphalt parking
  • Self preformed all foundation and slab on grade concrete work

201 Paint Street
Rockledge, FL 32955

T: 321-383-1171