YEAR
2006-2009
LOCATION
Space Coast, FL
ABOUT
JP. Donovan Construction, Inc. served as the prime contractor for six task orders for this multi-phase, multi-year project. The Eastern Processing Facility (EPF) Complex is over 40 acres with multiple facilities supporting the spacecraft processing facility main building.
- Site preparation, roadways and parking
- Steel fabrication and welding
- Survivability, security (SCIF), cleanroom, floor space, door opening, interface requirements
- Blast panels (DOD Explosive Safety Board), RF Shielding, and hypergolic compatibility requirements
- Regional needs of the facility included 155 mph sustained hurricane wind survivability, 14 feet above sea level to survive storm surge, and security systems.