What JP Donovan Provided

JPD served as the prime contractor for this project. The construction of a new flame deflector and refurbishment of the flame trench at the Launch Complex 39B (LC-39B), at Kennedy Space Center, Florida is for the future launches of NASA’s new Space Launch System (SLS). The completed structure will deflect SLS exhaust away from the vehicle and protect structures above the launch pad surface.

  • Large Structural Systems 
  • Interfaces to existing facility 
  • Strict tolerances for large structures 
  • Interfaces to existing facility systems and structures 
  • Launch Infrastructure 
  • Government Installation 
  • Specialty Coatings 
  • Welding/Fabrication/Assembly of structural steel 
  • Erection of large structural steel 
  • Installation of Large Diameter Piping 
  • Mechanical & Electrical 
  • Monitoring and Inspection 
  • Fire Suppression 
  • Monitoring Systems
Cryogenics For SLS Mobile Launcher

 As an AISC Certified Fabricator, JPD self-performed over 50 Percent of the work on this project.